Questions that come up before a specification is settled
This is where the longer pieces live. The water
problems section answers one symptom at a time and the
FAQ answers in a paragraph; an article here takes a single
question and works it through properly — including where the answer stops.
New pieces are published to this page as they are written, in the order they are written
rather than all at once. Every piece is dated, and a piece is revised rather than quietly
replaced when the position on it changes.
Seven articles publishedRevised in place, with the date shownNo figures without a source
Water that leaves a treatment stage clean does not stay clean on its own.
Between the last stage and the tap there are four physical places where water meets air, a
surface or time — and none of the four is fixed by adding another stage.
An ultraviolet stage delivers light to water, so how far that light
travels is decided by the water. What transmittance measures, why it is not turbidity, and
why a rating has to state the water it was established in.
Two documents that look alike on a page and answer different questions:
one is attached to a facility, the other to a named model and standard. What each one proves,
where the common misreading happens, and four questions that settle it from the paperwork
alone.
A dose in mJ/cm² looks like a specification. It is not one on its own: it
describes a product together with the conditions it was measured under. What the four
deciding variables are, what a number without its test conditions can and cannot tell a
buyer, and why this site publishes none.
Six numbers, two dates and one common misreading. What is already in
force, what is proposed and could still move, which supplies the rule does and does not
reach — and why a treatment train decided on the 2029 date alone is decided on the wrong
date.
The lamp is still lit, the indicator is still green and the water still
runs — so nothing looks wrong. But ultraviolet has to reach the water, and a film on the
sleeve is what stops it. How to tell fouling from a failing lamp, and what a cleaning
interval should actually be based on.
Chemical disinfection keeps working after it is dosed. Ultraviolet stops
the moment the water leaves the chamber, so it cannot protect anything downstream of itself.
That single difference is the reason the last position on the line is the only position that
answers the question most installations are actually asking.
7 min read
How these are written
Three rules these articles follow
A number without a source is not published
Where a figure would have to come from a test the manufacturer has not run,
the article is written without the figure and says so. That is why some pieces here discuss a
quantity at length and end without giving a value for it.
A gap is named, not left blank
A blank line in a specification usually means “ask us”. Here it
means the information is absent, and the article says which of the two it is rather than
leaving a reader to guess.
Enforceable and proposed are kept apart
Where regulation is discussed, what is in force and what is still only
proposed are separated in the text, because the difference decides whether an installation has
a deadline today or a planning assumption.
What is not here
Product values, feed-water limits and the document position are on the
data sheet, not in an article — an article is
the wrong place for a specification, because a specification has to be a single source rather
than one of several. Installation procedure is in the
installation guide, and the treatment of a
specific contaminant is in water problems.
A question none of these answers
Articles are written from questions that came up more than once. If yours has not been
covered, send it — the reply is more useful when it includes the line you are working on and
the market you are working to.
Available now: instruction manual · parameter table · CE certificate DPCW/01068/06/KA/26 · EPA Establishment No. 105777-CHN-1
Issued per order: net weight, unit dimensions, carton data, pricing, lead time
Send an enquiry
Typical response within one business day.
This form is not yet connected to a mail service — the enquiry endpoint will be wired up at launch. Until then, write to sales@skweit.cn or through the contact page.
Scope and document control
4 sources
Articles on this site are written from the manufacturer's published product documentation,
the certificates and registrations held by the manufacturer, and the publicly available
regulatory texts cited within each article. Sources are named in the article they support
rather than collected here.
Regulatory dates and thresholds are stated as they stood at the research cut-off shown on
the article. Regulatory positions change; the date on the piece is the date it was last
reviewed.
No article on this site asserts a microbiological performance figure, a log-reduction
figure, a UV dose value or a validated service life. Where a piece discusses one of those
quantities, it does so without supplying a value for the product.
Article dates: each piece carries the date it was published, and is revised in place with
that date updated when the position in it changes. There is no separate revision history,
because a page that keeps two versions invites a reader to rely on the older one.
Document control.
Published 30 September 2026 | Reviewed by the SKWEIT® technical documentation team.
Author: SKWEIT® technical documentation (Suzhou Purple Core Instant Purification Technology
Co.,Ltd.).
Scope note.
Articles describe in-line UVC post-treatment for pre-filtered drinking water and are written
for a technical reader. They are not installation instructions, not a specification, not
legal or regulatory advice, and not a warranty. Installations must comply with national and
local plumbing and electrical regulations.